Dany Painting & Remodeling LLC
A painter in a protective suit and respirator spray-finishing interior doors, with plastic on the ceiling and paper taped across the floor.

Eight services, done to one standard.

Painting, flooring, plumbing, electrical and remodeling — what's actually included in each one, and how the work runs.

01

Interior Painting

Walls, ceilings, trim, doors and cabinetry. Most of the time on an interior paint job goes into what happens before the color does — filling nail holes, sanding patches flush, caulking gaps at the trim and masking everything that isn't getting painted.

That's what makes the difference between a room that looks freshly painted and a room that looks like it was always that way: straight cut lines at the ceiling, no roller marks in raking light, and hardware that goes back on clean.

  • Walls, ceilings, baseboards, casings and crown
  • Doors, door frames and cabinetry refinishing
  • Drywall patching, sanding and caulking before primer
  • Floors, fixtures and furniture covered and protected
A painter in a protective suit and respirator spray-finishing interior doors, with plastic on the ceiling and paper taped across the floor.
02

Exterior Painting

Siding, trim, soffits, fascia, shutters and front doors. Exterior paint fails from the surface up, so the prep list is longer: wash off the chalk and mildew, scrape what's loose, sand the edges back, spot-prime bare spots and seal the joints that let water in.

Coatings get chosen for the substrate — wood, fiber cement, stucco and brick each want something different — and applied in weather that lets them cure properly.

  • Siding, trim, soffits, fascia and gutter board
  • Shutters, railings, columns and entry doors
  • Wash, scrape, sand, caulk and spot-prime before topcoat
  • Landscaping, walkways and windows masked off
Two painters on ladders coating the siding and trim of a two-story gray house, with drop cloths spread over the driveway and lawn.
03

Ceramic Flooring Installation

Ceramic and porcelain tile for floors, showers, backsplashes and entryways. Tile is unforgiving about what's underneath it, so the substrate gets checked for flat and solid first — a floor that flexes will crack grout no matter how well the tile was set.

Layout gets planned before the first tile goes down so cuts land where you won't stare at them, and so the lines stay square from one end of the room to the other.

  • Floor tile, shower and tub surrounds, backsplashes
  • Substrate prep, leveling and waterproofing where needed
  • Planned layout, consistent joints and clean cuts
  • Grout, seal and transition strips at every doorway
A tiled walk-in shower with a glass door, large-format wall tile, a pebble mosaic floor and an illuminated tiled niche.
04

Laminate Flooring Installation

Laminate and wood-look plank flooring, installed the way the manufacturer actually specifies: subfloor cleaned and flattened, underlayment run correctly, and expansion gaps left at every wall so the floor can move without buckling.

Plank direction and starting course get set deliberately, seams get staggered so the pattern doesn't repeat, and the trim and transitions get cut to close it all out.

  • Subfloor prep, leveling and moisture barrier
  • Underlayment and correct expansion gaps
  • Staggered seams and planned plank direction
  • Baseboard, quarter round and doorway transitions
A wide-plank light oak floor running the length of an open living area, toward a stone fireplace and a wall of windows.
05

General Plumbing

Fixture work and the supply and drain lines behind it — sinks, faucets, toilets, tubs, showers and the connections that feed them. Plumbing is also the first thing that has to happen on most kitchen and bathroom remodels, before anything gets closed up or tiled over.

Water gets shut down, tested and turned back on the same day wherever the scope allows, so you're not living around an open wall longer than necessary.

  • Faucet, sink, toilet, tub and shower fixture replacement
  • Supply and drain line work
  • Rough-in for kitchen and bathroom remodels
  • Leak checks before walls and floors are closed up
PVC drain standpipes and a check valve rising from a sealed sump basin lid in a framed basement floor.
06

Electrical Work

Outlets, switches, dimmers, ceiling fixtures, fans and the circuits that feed them. On a remodel, this is the other trade that has to run before the walls close — new can lights, a relocated island, or an outlet where there wasn't one all start inside the wall.

Everything gets landed properly, covers sit flat, and boxes end up where the fixture actually goes rather than where the old one happened to be.

  • Outlets, switches, dimmers and cover plates
  • Ceiling fixtures, recessed lighting and fans
  • New circuits and wiring for remodels and new layouts
  • Fixture swaps and troubleshooting
A gable end in mortar-washed white brick lit by soffit lights at dusk, above a white garage door and painted trim.
07

Exterior House Washing

Siding, driveways, walkways, patios, decks and fences washed back down to the color that's actually under there. Pressure gets matched to the surface — concrete takes what vinyl siding and painted wood will not, and using the same setting on both is how siding gets scarred.

It's also the step that decides how long exterior paint lasts. Washing before painting isn't an upsell; it's the reason the coating bonds.

  • Siding, brick, stucco and painted surfaces
  • Driveways, walkways, patios and porches
  • Decks, fences and railings
  • Pre-paint washing as part of an exterior job
Freshly painted lap and board-and-batten siding with black window trim on a finished home exterior.
08

Remodeling Projects

Kitchens, bathrooms and full rooms, from demo through the last piece of trim. The thing that makes a remodel go smoothly isn't any single trade — it's the order. Plumbing and electrical rough-in, then surfaces, then floors, then trim and paint.

Because all of those trades are in-house, the sequence doesn't depend on three companies coordinating with each other. You get one scope, one schedule and one person to call about any of it.

  • Kitchen and bathroom remodels
  • Full room renovations and layout changes
  • Demo, rough-in, surfaces, flooring and finish work
  • One scope, one schedule, one point of contact
A finished living room with white painted columns and wainscot, a stone fireplace surround and light wood flooring.

How a project runs

Four steps, no surprises.

Same process whether it's one room of paint or a full kitchen.

01

Walkthrough

We look at the actual space, talk through what you want, and measure what needs measuring. This is the free estimate visit.

02

Written Scope & Price

You get the work itemized in writing with a price attached — so you can compare it against anyone else honestly.

03

Schedule & Prep

Start and finish dates agreed up front. Before work begins, floors get covered and furniture and fixtures get protected.

04

Build & Walk It Again

The work runs in sequence, and we walk the finished job with you before calling it done.

Not sure which of these you need?

Describe the project and we'll tell you what it actually involves — including whether it needs one trade or four. Estimates are free either way.

Call Now Free Estimate